WA/DOT: Pioneer Park Pedestrian Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Pioneer Park Pedestrian Improvements Pedestrian enhancements at S Division St & Whitman St, S Division St & Newell St, and S Division St & Lincoln St. Whitman St. includes installation of cement concrete ADA ramps, removal and replacement of hazardous sidewalk, sidewalk infill, improvements to stormwater infrastructure, and curb bulb-outs to enhance pedestrian crossings and provide traffic calming
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Commercial, Power Generation (CCGT)
- Location
- Walla Walla, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: Pioneer Park Pedestrian Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pioneer Park Pedestrian Improvements Pedestrian enhancements at S Division St & Whitman St, S Division St & Newell St, and S Division St & Lincoln St. Whitman St. includes installation of cement concrete ADA ramps, removal and replacement of hazardous sidewalk, sidewalk infill, improvements to stormwater infrastructure, and curb bulb-outs to enhance pedestrian crossings and provide traffic calming measures, along with sidewalk infill and full road and utility replacement from S Division St to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Walla Walla |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Commercial, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
