WA/DOT: Preventative Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
2023- 2026 Operating, Preventative Maintenance This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for fixed route operations. During all years of this project 5307 Funds will be matched with local to maintain transit service.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Kennewick, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: Preventative Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2023- 2026 Operating, Preventative Maintenance This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for fixed route operations. During all years of this project 5307 Funds will be matched with local to maintain transit service. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Kennewick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
