logo
ProjectPlanning Schematics

WA/DOT: Preventative Maintenance

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

2023- 2026 Operating, Preventative Maintenance This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for fixed route operations. During all years of this project 5307 Funds will be matched with local to maintain transit service.

Status
Prospective
Sector
Road, Commercial, Manufacturing (Industrial)
Location
Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WA/DOT: Preventative Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: Preventative Maintenance” is an infrastructure initiative in the Road sector, located in Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2023- 2026 Operating, Preventative Maintenance This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for fixed route operations. During all years of this project 5307 Funds will be matched with local to maintain transit service.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial, Manufacturing (Industrial)

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project