WA/DOT: R Street SW Road Construction
Sector: Water Supply and Storage • Location: Quincy, Washington, United States of America
Source: Dodge
R Street SW , T Street SW and 10th Avenue SW Road Construction and Extension (QPW-23-003) Construction of road to extend R-Street SW from 7th Avenue SW to 13th Avenue SW, extend 10th Avenue SW to the proposed T-Street SW, and construct T-Street SW from 10th Avenue SW to 13th Avenue SW. Work also includes installation of potable water main, reclaimed water main, sewer main, and stormwater systems,
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Commercial
- Location
- Quincy, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: R Street SW Road Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | R Street SW , T Street SW and 10th Avenue SW Road Construction and Extension (QPW-23-003) Construction of road to extend R-Street SW from 7th Avenue SW to 13th Avenue SW, extend 10th Avenue SW to the proposed T-Street SW, and construct T-Street SW from 10th Avenue SW to 13th Avenue SW. Work also includes installation of potable water main, reclaimed water main, sewer main, and stormwater systems, relocation and or replacement of existing GCPUD main transmission power poles. 7th Avenue SW/N St... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Quincy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
