logo

WA/DOT: Safety and Bike lane Improvements

Sector: Water Supply and Storage • Location: Seattle, Washington, United States of America

Source: Dodge

Project
Planning Schematics

Beacon Ave S and 15th Ave S Safety Project will construct a protected bike lane along Beacon Ave S between S Spokane St and 15th Ave S, on 15th Ave S. between Beacon Ave S and 14th Ave S, and on Golf Dr S between 15th Ave S and S Charles St. Scope elements include curb and gutter, sidewalk, curb ramps, storm drainage improvements, concrete and asphalt paving, tree pits, signal modifications and pa

Status
Prospective
Sector
Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WA/DOT: Safety and Bike lane Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: Safety and Bike lane Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Beacon Ave S and 15th Ave S Safety Project will construct a protected bike lane along Beacon Ave S between S Spokane St and 15th Ave S, on 15th Ave S. between Beacon Ave S and 14th Ave S, and on Golf Dr S between 15th Ave S and S Charles St. Scope elements include curb and gutter, sidewalk, curb ramps, storm drainage improvements, concrete and asphalt paving, tree pits, signal modifications and pavement markings.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project