logo
ProjectConstruction Documents

WA/DOT: SR 104 Bridge Replacement

Construction documents · Washington · Last reported Mar 2024

Source: Dodge USA

SR 104/Kingston Trm Slip 1/2 Seismic Retrofit/Trestle Approach Imp. - Slip 1/2 - Bridge Seat & Trestle Seismic Retrofit/Trestle Approach Imp

Status
Closed
Sector
Bridge, Road, Commercial
Location
Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WA/DOT: SR 104 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: SR 104 Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SR 104/Kingston Trm Slip 1/2 Seismic Retrofit/Trestle Approach Imp. - Slip 1/2 - Bridge Seat & Trestle Seismic Retrofit/Trestle Approach Imp

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project