logo

WA/DOT: SR 104/Hood Canal Bridge Repair Phase 3

Sector: Water Supply and Storage • Location: Washington, United States of America

Source: Dodge USA

Project
Planning Schematics

SR 104/Hood Canal Bridge - Repair Pontoon Hatches Phase 3 Replace pontoon hatches on bridge 104/005.1. Hatches on the pontoon deck of the Hood Canal Bridge have failed. Replace the failed hatches on the pontoon deck, extending the service life of the bridge.

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: SR 104/Hood Canal Bridge Repair Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Planning Schematics

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SR 104/Hood Canal Bridge - Repair Pontoon Hatches Phase 3 Replace pontoon hatches on bridge 104/005.1. Hatches on the pontoon deck of the Hood Canal Bridge have failed. Replace the failed hatches on the pontoon deck, extending the service life of the bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data