WA/DOT: Sr 171 Moses Lake Rrfb Retrofit - Mast Arm 25b001
Sector: Water Supply and Storage • Location: Moses Lake, Washington, United States of America
Source: Dodge USA
Requires inlet protection, compost sock, high visibility fence, cement concrete traffic curb and gutter, pedestrian curb, plastic stop line, permanent signing, intelligent transportation systems (ITS) - rectagular rapid flashing beacon (RRFB) signals, project temporary traffic control, work zone safety contingency, shoring or extra excavation, Americans with disabilities act (ADA) features surveyi
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Road, Cement, Car parking, Manufacturing (Industrial), Automotive
- Location
- Moses Lake, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: Sr 171 Moses Lake Rrfb Retrofit - Mast Arm 25b001
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Requires inlet protection, compost sock, high visibility fence, cement concrete traffic curb and gutter, pedestrian curb, plastic stop line, permanent signing, intelligent transportation systems (ITS) - rectagular rapid flashing beacon (RRFB) signals, project temporary traffic control, work zone safety contingency, shoring or extra excavation, Americans with disabilities act (ADA) features surveying, cement concrete sidewalk and curb ramp, force account irrigation repair, and other work. Invo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Moses Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Cement, Car parking, Manufacturing (Industrial), Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
