WA/DOT: SR 25/Spokane River Crossing - Bridge Painting
Sector: Steel • Location: Spokane, Washington, United States of America
Source: Dodge
The existing steel surfaces of the Spokane River Crossing Bridge located 23.35 miles north of Davenport require cleaning and painting to delay deterioration. Removing and replacing the expansion joint is also needed to preserve the structural integrity and extend the service life of this steel bridge.SR 25/Spokane River Crossing - Bridge Painting
- Status
- Prospective
- Sector
- Steel, Road, Bridge, Commercial, Metal
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: SR 25/Spokane River Crossing - Bridge Painting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing steel surfaces of the Spokane River Crossing Bridge located 23.35 miles north of Davenport require cleaning and painting to delay deterioration. Removing and replacing the expansion joint is also needed to preserve the structural integrity and extend the service life of this steel bridge.SR 25/Spokane River Crossing - Bridge Painting |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Road, Bridge, Commercial, Metal |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
