WA/DOT: SR 31 Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
SR 31/Sullivan Creek Crossing - Bridge Replacement.The Sullivan Creek bridge is 91 years old and structurally deficient. Remove the existing structure and replace it with a new one to preserve the structural integrity of this section of highway.
- Status
- Prospective
- Sector
- Road, Commercial, Bridge
- Location
- Metaline Falls, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: SR 31 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SR 31/Sullivan Creek Crossing - Bridge Replacement.The Sullivan Creek bridge is 91 years old and structurally deficient. Remove the existing structure and replace it with a new one to preserve the structural integrity of this section of highway. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Metaline Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Bridge |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
