WA/DOT: SR 525 Paving Improvements
Sector: Water Supply and Storage • Location: Mill Creek, Washington, United States of America
Source: Dodge
Requires planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, signal loop replacement, pavement markings, truck apron installation, temporary erosion and water pollution control, traffic control and other work. Involves 56 items and 49 working days. Work class 4, asphalt paving.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Car parking, Automotive, Commercial
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: SR 525 Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Requires planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, signal loop replacement, pavement markings, truck apron installation, temporary erosion and water pollution control, traffic control and other work. Involves 56 items and 49 working days. Work class 4, asphalt paving. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Automotive, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
