WA/DOT: SR 904 2024 CW Branch Betz Rd Crossing - PCC
Sector: Commercial • Location: Cheney, Washington, United States of America
Source: Dodge USA
Removing sidewalk, curb, gutter, pavement markings, ties, and roadway excavation, installing crushed surfacing base course, hot mix asphalt, curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ties, ballast distribution, surface line and dress, surveying, erosion control, traffic control and other work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Removing sidewalk, curb, gutter, pavement markings, ties, and roadway excavation, installing crushed surfacing base course, hot mix asphalt, curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ties, ballast distribution, surface line and dress, surveying, erosion control, traffic control and other work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
