logo
ProjectPlanning Schematics

WA/DOT: SR520 Bridge Replacement Master Report

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The three-lane, 1.2-mile-long west approach bridge structure will connect the westbound lanes of the newSR 520 floating bridge to the Montlake interchange in Seattle. Construction of the West Approach BridgeNorth project is expected to be completed by Fall 2016.The construction elements of the project also includes: Extending the regional shared-use bicycle/pedestrian path from the new floating br

Status
Prospective
Sector
Bridge, Commercial, Car parking, Road, Automotive
Location
Seattle, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WA/DOT: SR520 Bridge Replacement Master Report

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: SR520 Bridge Replacement Master Report” is an infrastructure initiative in the Bridge sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The three-lane, 1.2-mile-long west approach bridge structure will connect the westbound lanes of the newSR 520 floating bridge to the Montlake interchange in Seattle. Construction of the West Approach BridgeNorth project is expected to be completed by Fall 2016.The construction elements of the project also includes: Extending the regional shared-use bicycle/pedestrian path from the new floating bridge to theMontlake interchange, and extending the transit/HOV lanesfrom the Eastside to Union Ba...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Car parking, Road, Automotive

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project