WA/DOT: SR520 Bridge Replacement Master Report
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The three-lane, 1.2-mile-long west approach bridge structure will connect the westbound lanes of the newSR 520 floating bridge to the Montlake interchange in Seattle. Construction of the West Approach BridgeNorth project is expected to be completed by Fall 2016.The construction elements of the project also includes: Extending the regional shared-use bicycle/pedestrian path from the new floating br
- Status
- Prospective
- Sector
- Bridge, Commercial, Car parking, Road, Automotive
- Location
- Seattle, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: SR520 Bridge Replacement Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The three-lane, 1.2-mile-long west approach bridge structure will connect the westbound lanes of the newSR 520 floating bridge to the Montlake interchange in Seattle. Construction of the West Approach BridgeNorth project is expected to be completed by Fall 2016.The construction elements of the project also includes: Extending the regional shared-use bicycle/pedestrian path from the new floating bridge to theMontlake interchange, and extending the transit/HOV lanesfrom the Eastside to Union Ba... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Commercial, Car parking, Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
