WA/DOT: Trolley System Transit Asset Maintenance
Planning schematics · Washington · Last reported Jul 2025
Source: Dodge
Trolley System Transit Asset Maintenance 2027-2028 The project funds a range of capital maintenance and repair work on the overhead catenary system that powers Metro's electric trolley bus fleet. The work includes replacement, maintenance and repair of wires, spanners, building attachments, electrical transmission lines, ducts and vaults and other related system elements. The project is funded wit
- Status
- Prospective
- Sector
- Power Generation (CCGT), Rail, Mass Transit, Cable car, Power Transmission, Telecommunications, Commercial, Automotive
- Location
- Black Diamond, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: Trolley System Transit Asset Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Trolley System Transit Asset Maintenance 2027-2028 The project funds a range of capital maintenance and repair work on the overhead catenary system that powers Metro's electric trolley bus fleet. The work includes replacement, maintenance and repair of wires, spanners, building attachments, electrical transmission lines, ducts and vaults and other related system elements. The project is funded with federal funds using state toll credits as local match. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Black Diamond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Rail, Mass Transit, Cable car, Power Transmission, Telecommunications, Commercial, Automotive |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
