logo
ProjectPlanning Schematics

WA/DOT: Trolley System Transit Asset Maintenance

Planning schematics · Washington · Last reported Jul 2025

Source: Dodge

Trolley System Transit Asset Maintenance 2027-2028 The project funds a range of capital maintenance and repair work on the overhead catenary system that powers Metro's electric trolley bus fleet. The work includes replacement, maintenance and repair of wires, spanners, building attachments, electrical transmission lines, ducts and vaults and other related system elements. The project is funded wit

Status
Prospective
Sector
Power Generation (CCGT), Rail, Mass Transit, Cable car, Power Transmission, Telecommunications, Commercial, Automotive
Location
Black Diamond, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WA/DOT: Trolley System Transit Asset Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: Trolley System Transit Asset Maintenance” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Black Diamond, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Trolley System Transit Asset Maintenance 2027-2028 The project funds a range of capital maintenance and repair work on the overhead catenary system that powers Metro's electric trolley bus fleet. The work includes replacement, maintenance and repair of wires, spanners, building attachments, electrical transmission lines, ducts and vaults and other related system elements. The project is funded with federal funds using state toll credits as local match.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Black Diamond

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Rail, Mass Transit, Cable car, Power Transmission, Telecommunications, Commercial, Automotive

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project