WA/DOT: US 97 Lateral A Intersection Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Lateral A intersection with a two lane roundabout, paving with hot mix asphalt pavement, installing truck apron and splitter islands with cement concrete, mountable cement concrete curb and gutters, shared use paths, illumination, delineation, landscaping, signing, traffic control and other work. 110 working days. Involves 84 items. Work class 4.
- Status
- Closed
- Sector
- Cement, Mass Transit, Car parking, Commercial, Rail, Road, Automotive
- Location
- Wapato, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: US 97 Lateral A Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lateral A intersection with a two lane roundabout, paving with hot mix asphalt pavement, installing truck apron and splitter islands with cement concrete, mountable cement concrete curb and gutters, shared use paths, illumination, delineation, landscaping, signing, traffic control and other work. 110 working days. Involves 84 items. Work class 4. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Wapato |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Mass Transit, Car parking, Commercial, Rail, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
