WA/DOT: Water Ditch Trail Phase IIIB Reconstruction
Sector: Car parking • Location: Tacoma, Washington, United States of America
Source: Dodge USA
Water Ditch Trail Phase IIIB will reconstruct South Tacoma Way between S Pine St and S Sprague Ave including a grind and overlay, rechannelization between S Pine St and S 35th St, add a shared-use path on the north side and a sidewalk on the south side. The shared-use path will be separated from vehicular traffic with a vertical separation (curb) and a planter strip. Beacons and pedestrian islands
- Status
- Prospective
- Sector
- Car parking, Water Supply and Storage, Road, Automotive, Commercial
- Location
- Tacoma, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: Water Ditch Trail Phase IIIB Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water Ditch Trail Phase IIIB will reconstruct South Tacoma Way between S Pine St and S Sprague Ave including a grind and overlay, rechannelization between S Pine St and S 35th St, add a shared-use path on the north side and a sidewalk on the south side. The shared-use path will be separated from vehicular traffic with a vertical separation (curb) and a planter strip. Beacons and pedestrian islands will be installed at select unsignalized crossings. Roadway scale illumination will be installed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Tacoma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Road, Automotive, Commercial |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
