logo

Wagon Trail Solar Energy Farm Phase 1 260MW/346MW BESS

Sector: Commercial • Location: Oregon, United States of America

Source: Dodge USA

Project
Pre-Design

Up to 500 megawatts (MW) of solar, battery storage system capable of storing up to 500 MW; Approximately 7,450 acres located in Morrow County, Oregon; Solar array footprint is approximately 3,641 acres within the boundary; Interconnects to the existing Blue Ridge Substation; Existing capacity on Blue Ridge to Morrow Flat Transmission Line

Status
Prospective
Sector
Commercial, Raw Materials, Energy Storage, Power Generation (CCGT), Solar, Residential
Location
Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wagon Trail Solar Energy Farm Phase 1 260MW/346MW BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wagon Trail Solar Energy Farm Phase 1 260MW/346MW BESS” is an infrastructure initiative in the Commercial sector, located in Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Up to 500 megawatts (MW) of solar, battery storage system capable of storing up to 500 MW; Approximately 7,450 acres located in Morrow County, Oregon; Solar array footprint is approximately 3,641 acres within the boundary; Interconnects to the existing Blue Ridge Substation; Existing capacity on Blue Ridge to Morrow Flat Transmission Line

Budget

Location

Country

United States of America (USA)

State

Oregon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Raw Materials, Energy Storage, Power Generation (CCGT), Solar, Residential

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project