Waimanalo Flood Control Channel Improvements Phase 2
Sector: Government • Location: Honolulu, Hawaii, United States of America
Source: Dodge
This project generally includes the furnishing of all supervision, labor, materials, equipment and all other items related to and necessary to perform concrete relining, concrete spall repair, and concrete crack repair portions of the WAIMANALO FLOOD CONTROL CHANNEL IMPROVEMENTS PHASE 2
- Status
- Closed
- Sector
- Government, Cement, Commercial, Manufacturing (Industrial)
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Waimanalo Flood Control Channel Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project generally includes the furnishing of all supervision, labor, materials, equipment and all other items related to and necessary to perform concrete relining, concrete spall repair, and concrete crack repair portions of the WAIMANALO FLOOD CONTROL CHANNEL IMPROVEMENTS PHASE 2 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
