Waldron City Trail
One of 10,000+ projects Taiyo tracks in Arkansas.
Source: Dodge
The project includes the resurfacing of an existing walking track with asphalt surface, installation of concrete grated drainage structures, replacement of 15" drainage pipe with 18" HDPE pipe, and fence repair.
- Status
- Prospective
- Sector
- Government, Cement, Mass Transit, Road, Rail, Commercial, Car parking, Automotive, Waste Processing and Treatment
- Location
- Waldron, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Waldron City Trail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the resurfacing of an existing walking track with asphalt surface, installation of concrete grated drainage structures, replacement of 15" drainage pipe with 18" HDPE pipe, and fence repair. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Waldron |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Mass Transit, Road, Rail, Commercial, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
