logo

Walk-In Cooler Repair

Sector: Warehouse • Location: Washington, District of Columbia, United States of America

Source: Dodge USA

Project
Bid Results

SCOPE OF WORK (SOW) 2.1. DESCRIPTION OF WORK Provide and install the following new equipment items at NEOB Cafeteria: Walk-in cooler was low on refrigerant however this unit is a R22 unit which is phased out. Condenser and compressor needs a full replacement. Took measurements and specs of unit and send to Aireco and they will email price and availability of unit. Inform POC that we will need 2 mo

Status
Closed
Sector
Warehouse, Commercial, Manufacturing (Industrial)
Location
Washington, District of Columbia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Walk-In Cooler Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Walk-In Cooler Repair” is an infrastructure initiative in the Warehouse sector, located in Washington, District of Columbia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SCOPE OF WORK (SOW) 2.1. DESCRIPTION OF WORK Provide and install the following new equipment items at NEOB Cafeteria: Walk-in cooler was low on refrigerant however this unit is a R22 unit which is phased out. Condenser and compressor needs a full replacement. Took measurements and specs of unit and send to Aireco and they will email price and availability of unit. Inform POC that we will need 2 more techs for this job, and he requested that info be sent to get them cleared for entry quote for...

Procurement method

Budget

Location

Country

United States of America (USA)

State

District of Columbia

City

Washington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Warehouse, Commercial, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project