Walker Farm Dock Site Work
Bidding · Rhode Island · Last reported Oct 2024
Source: Dodge USA
Work shall be to provide the Town of Barrington (hereafter Town ) with completed ready-for-use facilities. Scope includes but is not limited to the following: installation of on-shore dock structure, rip rap armoring, and site restoration. Incidental to these improvements are the installation of erosion control measures, site clearing, and all work necessary to complete the project to the acceptan
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Raw Materials, Government
- Location
- Barrington, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Walker Farm Dock Site Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work shall be to provide the Town of Barrington (hereafter Town ) with completed ready-for-use facilities. Scope includes but is not limited to the following: installation of on-shore dock structure, rip rap armoring, and site restoration. Incidental to these improvements are the installation of erosion control measures, site clearing, and all work necessary to complete the project to the acceptance of the Town. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Barrington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Raw Materials, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
