logo
ProjectPlanned

Walker Springs II Solar Project

Planned · Alabama · Last reported Dec 2025

Source: SolarQuarter

Walker Springs II is a utility-scale solar project in Clarke County, Alabama, funded alongside Walker Springs I by a $200 million tax equity commitment from Advantage Capital. It is expected to be operational in early 2026, contributing to renewable energy capacity and economic growth in the region.

Status
Prospective
Sector
Power Transmission, Solar, Power Generation (CCGT)
Location
Alabama, United States of America
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about Walker Springs II Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Walker Springs II Solar Project” is an infrastructure initiative in the Power Transmission sector, located in Alabama, United States. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Walker Springs II is a utility-scale solar project in Clarke County, Alabama, funded alongside Walker Springs I by a $200 million tax equity commitment from Advantage Capital. It is expected to be operational in early 2026, contributing to renewable energy capacity and economic growth in the region.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Alabama

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Power Transmission, Solar, Power Generation (CCGT)

Article published date

2025-12-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project