Walker Switch Water System Improvements Arpa Phase 2
Sector: Water Supply and Storage • Location: Iuka, Mississippi, United States of America
Source: Dodge
Proposed Water Improvements: Install approximately 3,000 linear feet of 6-inch diameter water pipe line with associated steel encased bores at roadways, service line reconnections, and other appurtenant items, including but not limited to, fittings, valves, hydrants, driveway bores, machine taps, wet taps, and erosion control.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Road, Commercial, Waste Processing and Treatment, Government, Metal
- Location
- Iuka, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Walker Switch Water System Improvements Arpa Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed Water Improvements: Install approximately 3,000 linear feet of 6-inch diameter water pipe line with associated steel encased bores at roadways, service line reconnections, and other appurtenant items, including but not limited to, fittings, valves, hydrants, driveway bores, machine taps, wet taps, and erosion control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Iuka |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Road, Commercial, Waste Processing and Treatment, Government, Metal |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
