logo
ProjectClosed

Walking Trail Bridge and Boardwalk Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

100 meters of boardwalk between 7th Street and 8th Street along North Road Allowance and a bridge crossing a drainage ditch at the Leader Ball Diamonds.

Status
Closed
Sector
Mass Transit, Bridge, Rail, Road, Seaport, Commercial, Waste Processing and Treatment
Location
Leader, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Walking Trail Bridge and Boardwalk Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Walking Trail Bridge and Boardwalk Construction” is an infrastructure initiative in the Mass Transit sector, located in Leader, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

100 meters of boardwalk between 7th Street and 8th Street along North Road Allowance and a bridge crossing a drainage ditch at the Leader Ball Diamonds.

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Leader

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Bridge, Rail, Road, Seaport, Commercial, Waste Processing and Treatment

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project