logo
ProjectBid Results

Walkways Improvements

Sector: Metal • Location: New Bedford, Massachusetts, United States of America

Source: Dodge USA

The Project consists of: installation of erosion control measures and tree protection; saw cutting of asphalt; removal and disposal of existing bituminous concrete walkways/areas; removal, disposal and replacement of metal clothesline posts and footings; preparing the walkway subgrade; material testing; protection of work; loam and seed areas; repair and adjustment of existing drainage basins; and

Status
Closed
Sector
Metal, Cement, Road, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment
Location
New Bedford, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Walkways Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Walkways Improvements” is an infrastructure initiative in the Metal sector, located in New Bedford, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of: installation of erosion control measures and tree protection; saw cutting of asphalt; removal and disposal of existing bituminous concrete walkways/areas; removal, disposal and replacement of metal clothesline posts and footings; preparing the walkway subgrade; material testing; protection of work; loam and seed areas; repair and adjustment of existing drainage basins; and construction of ADA accessible bituminous concrete walkways.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

New Bedford

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Cement, Road, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project