Walnut Creek Wastewater Treatment Plant Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: Smart Water Magazine
Expansion of the Walnut Creek Wastewater Treatment Plant in Austin to increase capacity from 75 million gallons per day to 100 million gallons per day, including upgrades to treatment processes and infrastructure such as advanced nutrient reduction technology, ultraviolet disinfection, odour control systems, flood wall construction, and modernization of aging components.
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Smart Water Magazine
ConstructChat
Ask ConstructChat about Walnut Creek Wastewater Treatment Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Expansion of the Walnut Creek Wastewater Treatment Plant in Austin to increase capacity from 75 million gallons per day to 100 million gallons per day, including upgrades to treatment processes and infrastructure such as advanced nutrient reduction technology, ultraviolet disinfection, odour control systems, flood wall construction, and modernization of aging components. |
Original sector | Water and Wastewater |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Smart Water Magazine |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
