Walnut St. Pump Station BBSA Capital Improvement
Sector: Road • Location: Bangor, Pennsylvania, United States of America
Source: Dodge USA
The existing Walnut Street Pump Station is constructed with a steel wet well and does not include automated alarm systems or flow monitoring. The original design was an airlift system which was converted to a submersible pump system. The pump station will be reconstructed, and a new meter installed. The pump station will be equipped with a remote connection to the WWTP HMI to remotely monitor and
- Status
- Closed
- Sector
- Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage
- Location
- Bangor, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Walnut St. Pump Station BBSA Capital Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing Walnut Street Pump Station is constructed with a steel wet well and does not include automated alarm systems or flow monitoring. The original design was an airlift system which was converted to a submersible pump system. The pump station will be reconstructed, and a new meter installed. The pump station will be equipped with a remote connection to the WWTP HMI to remotely monitor and record wet well elevation, pump status, flow rates, and alarm conditions. The HMI will be program... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Bangor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
