logo

Walsh Group Headquarters Expansion

Sector: Biomass • Location: United States of America (USA)

Source: Walsh

Project
Completed

The Walsh Group recently expanded its Chicago headquarters by renovating an existing three-story building and adding a floor to create a 93,000-square-foot, state-of-the-art office building. The facility is LEED Platinum certified and includes a three-story architectural glass staircase within a sky-lit atrium with a retired bulldozer as a centerpiece. The building is composed of offices, conferen

Project Information FAQ

Project Information

5 Q
The project “Walsh Group Headquarters Expansion” is an infrastructure initiative in the Biomass sector, located in United States of America (USA). Taiyo aggregates data on it from Walsh.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Walsh Group recently expanded its Chicago headquarters by renovating an existing three-story building and adding a floor to create a 93,000-square-foot, state-of-the-art office building. The facility is LEED Platinum certified and includes a three-story architectural glass staircase within a sky-lit atrium with a retired bulldozer as a centerpiece. The building is composed of offices, conference rooms, training space and 20,000 square feet of heated indoor parking. At the time of its completion, the project was certified as LEED Platinum with the sixth highest total point achievement of any project submitted to the USGBC. Highlights include a green roof covering 70 percent of the building roof surface, rainwater harvesting, 95 percent construction waste recycling throughout construction, existing building material re-use, and integrated HVAC and lighting controls with a high-efficiency enclosure and mechanical system reducing yearly annual energy costs by 42 percent.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data