Walterdale Bridge Replacement

Sector: Automotive • Location: Canada

Source: Road Traffic Technology

Project
Closed

The Walterdale Bridge was opened for traffic in September 2017. Credit: IQRemix. Two major arch lifts on the river were completed by April 2016. Credit: DIALOG. The old Walterdale Dridge, a steel grating-decked bridge, will be dismantled in late 2017. Credit: Smackaay. The 100-year-old Walterdale Bridge, which crosses the North Saskatchewan River in Edmonton, Canada, is being replaced with a new b

Project Information FAQ

Project Information

5 Q
The project “Walterdale Bridge Replacement” is an infrastructure initiative in the Automotive sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Walterdale Bridge was opened for traffic in September 2017. Credit: IQRemix. Two major arch lifts on the river were completed by April 2016. Credit: DIALOG. The old Walterdale Dridge, a steel grating-decked bridge, will be dismantled in late 2017. Credit: Smackaay. The 100-year-old Walterdale Bridge, which crosses the North Saskatchewan River in Edmonton, Canada, is being replaced with a new bridge in a project that was initiated in July 2013. The bridge links the intersection of Queen Elizabeth Park Road and Walterdale Hill on the south side of the river with the River Valley Road / Rossdale Road / 105 Street intersection located on the north side. The new bridge was opened in September 2017 and is used by approximately 33,000 vehicles a day. The old bridge will be demolished by the end of 2017. The $155m bridge replacement project is being managed by the City of Edmonton. The Walterdale Bridge was a steel grating-decked bridge when it first opened in 2013. The condition of the bridge was assessed during a detailed study by BP-Tec, which evaluated the life expectancy of the bridge and its components in 2000. After 100 years of service, the bridge showed signs of age, prompting rehabilitation and maintenance works. The Edmonton City Council approved concept plans for the Walterdale bridge replacement in April 2011. The project moved to the preliminary design phase in July 2011. ISL Engineering and Land Services provided designs on behalf of The City of Edmonton. In June 2012, the project entered the detailed design phase. The final bridge design included details of alignment, construction lay-down areas, and associated road and trail connections, utility relocations and requirements to protect cultural heritage and the environment. Archaeological pit testing on the north bank of the project area was completed in December 2012. The new replacement road bridge includes three lanes of northbound traffic, a separate shared-use path on the east side, and a walkway on the west side. It is a single-span structure with a 230m deck, and two 56m-tall arches spanning the river just east of the current bridge. The bridge structure is supported by deep pile foundations while 400m³ concrete thrust blocks on the riverbanks will support its arches. Pre-construction work for the Walterdale Bridge replacement started in January 2013, and the main project began in July. Grading work on Queen Elizabeth Park Road was completed in October 2013. In March 2014, construction began on the thrust blocks for the four cofferdams on both sides of the river. The blocks were completed by February 2015, while the 950t central arch was floated into place in November the same year. Thefirst major arch lift took place in January 2016. The second lift, which saw the 2,000t signature bridge arch raised to a height of 54m above the river, was carried out in April 2016. Construction of two arches was completed by April 2016 while the concrete deck pores were completed in October 2016. The west sidewalk and the three lanes were completed by September 2017. DIALOG was awarded the contract to provide designs and construction management. Buckland & Taylor was selected as sub-consultant to DIALOG for the bridge design. ISL Engineering and Land Services were selected as consultants for the project, while Acciona Pacer Joint Venture was contracted to provide bridge construction services. Al-Terra Engineering was contracted to provide roadwork design, Thurber Engineering was contracted to provide geotechnical support and Spencer Environmental Management Services provided environmental services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data