Waltham Elson Road Utility Project
Sector: Car parking • Location: Waltham, Massachusetts, United States
Source: Patch
The project involves various water and sewer improvements to Elson Road and Irving Street, including roadway and sidewalk repaving. Construction is currently underway, with crews clearing and grubbing along Elson Road.
- Status
- Under Construction
- Sector
- Car parking, Road, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive
- Location
- Waltham, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Waltham Elson Road Utility Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves various water and sewer improvements to Elson Road and Irving Street, including roadway and sidewalk repaving. Construction is currently underway, with crews clearing and grubbing along Elson Road. |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Waltham |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
