logo

Walton Bridge Replacement

Sector: Automotive • Location: Thailand

Source: Road Traffic Technology

Project
Closed

Walton Bridge crosses the River Thames, connecting Shepperton and Walton. The sixth Walton Bridge crosses the Thames in one span. The sixth bridge reduces traffic congestion at the crossing. The fourth and fifth bridges were replaced by the new sixth bridge. Walton Bridge crosses England’s River Thames, connecting Shepperton and Walton. The road across the bridge is part of the A244, which links F

Project Information FAQ

Project Information

5 Q
The project “Walton Bridge Replacement” is an infrastructure initiative in the Automotive sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Walton Bridge crosses the River Thames, connecting Shepperton and Walton. The sixth Walton Bridge crosses the Thames in one span. The sixth bridge reduces traffic congestion at the crossing. The fourth and fifth bridges were replaced by the new sixth bridge. Walton Bridge crosses England’s River Thames, connecting Shepperton and Walton. The road across the bridge is part of the A244, which links Feltham, Sunbury, Hersham, Esher, Shepperton, Oxshott, Walton and Leatherhead. The previously existing structure was the fifth Walton Bridge, constructed in 1999, and was open to pedestrians, vehicles and cycles. Approximately 1,200 heavy goods vehicles used the bridge daily, and about 34,000 vehicles used it on weekdays. The bridge is owned by Surrey County Council. Construction of the new sixth bridge began in January 2011 and was completed in July 2013. It replaced the fourth and fifth Walton Bridges. The first Walton Bridge was constructed in 1750 out of timber, but was dismantled in 1783 when it fell into disrepair. Replacement bridges were constructed at in 1788, 1864, 1953 and 1999. The third bridge – built in 1864 – was damaged during World War II, which necessitated building the temporary fourth and fifth bridges in 1953 and 1999. The intended lifespan of the fifth bridge comes to an end in December 2014. Surrey County Council and the UK Government therefore decided to build a permanent bridge in its place. The new structure provides improved access to local businesses, major employers and shopping centres. The construction contract for the new bridge was awarded to Costain. Preliminary construction work began at the end of January 2011, and main construction was started in January 2012. The fifth bridge remained open during the construction phase, but was closed to traffic overnight or at weekends. Excavations and vegetation clearance were performed to make the site ready for the construction of a boundary wall. Other preliminary site clearance works, such as locating and marking cables and pipes in the vicinity, were also carried out. An archaeological investigation on the ground started in mid-April 2011. It involved excavation of a number of trenches and was completed in September 2011. Most of the earth moving works for landscaping were performed. Works were carried out to move the pipes and cables at the main construction site. Other construction works included expansion of the Cowey Sale car park and demolition of properties near the river. Surrey County Council awarded the design contract to Atkins. The new bridge crosses the Thames in a single span and has a slender roadway, which is supported from the two arches by hangers. The height of the new roadway is raised 0.1m higher than the previous bridge to provide additional headroom for boats. The new bridge has a 3.65m lane in each direction, and a 3.5m-wide footway or cycle way on both sides. The new design incorporates a T-junction at Walton Lane; the road was widened to accommodate a third lane of traffic at this point. The design of the sixth bridge resolves many of the problems associated with the fourth and fifth bridges — in particular reducing congestion on the river crossing on Cowey Sale junction by removing bottlenecks. The design also intends to reduce accidents. The estimated cost of the bridge replacement project was £32.3m ($51.2m). The UK Government funded £23.9m ($37.9m) for the project. Surrey County Council provided the remaining £8.4m ($13.3m).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data