Walworth County MSD Primary Clarifier Rehabilitation
Sector: Water Supply and Storage • Location: Delavan, Wisconsin, United States of America
Source: Dodge
The Work of this Contract is generally described as replacements of mechanical and structural components and structural repairs to four existing rectangular primary clarifier tanks. The project includes civil, process, structural, electrical, and instrumentation and control aspects. Self-draining, non-freezing, compression type hydrant. C. 2-inch inlet and 1-1/2-inch outlet. D. 3-inch ductile iron
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Steel
- Location
- Delavan, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Walworth County MSD Primary Clarifier Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work of this Contract is generally described as replacements of mechanical and structural components and structural repairs to four existing rectangular primary clarifier tanks. The project includes civil, process, structural, electrical, and instrumentation and control aspects. Self-draining, non-freezing, compression type hydrant. C. 2-inch inlet and 1-1/2-inch outlet. D. 3-inch ductile iron pipe riser. E. Single nozzle outlet. F. Bolted flange top. G. Operating rod shall be stainless s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Delavan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Steel |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
