logo

Wan Chai Development Phase II, Engineering Works

Sector: Car parking • Location: Hong Kong

Source: South Development Office

Project
Completed

The scope of the project comprises: reclamation of the seabed in Wan Chai North and North Point to form a total of about 12.7 ha of land, including construction of about 1.57 km of seawall; construction of precast box structures spanning over the existing Mass Transit Railway (MTR) Tsuen Wan Line; construction of ground level roads of about 0.7 km in total length, modification of existing roads fo

Project Information FAQ

Project Information

5 Q
The project “Wan Chai Development Phase II, Engineering Works” is an infrastructure initiative in the Car parking sector, located in Hong Kong. Taiyo aggregates data on it from South Development Office.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of the project comprises: reclamation of the seabed in Wan Chai North and North Point to form a total of about 12.7 ha of land, including construction of about 1.57 km of seawall; construction of precast box structures spanning over the existing Mass Transit Railway (MTR) Tsuen Wan Line; construction of ground level roads of about 0.7 km in total length, modification of existing roads for connection with the slip roads of the proposed Trunk Road, and some other road junction improvement works; extension of a dual two-lane primary distributor, Road P2, and realignment of the existing Convention Avenue and Hung Hing Road, of about 1.0 km in total length; relocation of a public transport interchange (PTI) at Expo Drive East to combine with an existing PTI at Wan Chai North; construction of a footbridge of about 180 m in length along Wan Shing Street; construction of three pedestrian landscaped decks to the west of Hong Kong Convention and Exhibition Centre (HKCEC), the north of the Wan Chai North PTI and the north of Victoria Park; construction of stormwater box culverts of about 1.17 km in total length in Wan Chai North and North Point and the associated hinterland drainage improvement works; reprovisioning of existing waterfront facilities including cross harbour water mains, submarine sewage outfall pipelines, ferry piers, cooling water pumping systems and a salt water pumping station; construction of associated footpaths, roadside amenities, stormwater drainage works, sewerage works and landscaping works; and implementation of environmental mitigation measures, and an environmental monitoring and audit (EM&A) programme for the works mentioned above.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data