Wandoan South Solar 2 Expansion
Sector: Power Generation (CCGT) • Location: Wandoan, Queensland, Australia
Source: pv magazine Australia
Vena Energy is set to begin construction of the 320 MW Wandoan South Solar 2 facility, which is part of the multi-phased Wandoan South renewable energy project in Queensland. This expansion aims to enhance renewable energy generation capacity in the region, contributing to Queensland's energy landscape and supporting Australia's net zero goals by 2050.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Solar
- Location
- Wandoan, Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- pv magazine Australia
ConstructChat
Ask ConstructChat about Wandoan South Solar 2 Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vena Energy is set to begin construction of the 320 MW Wandoan South Solar 2 facility, which is part of the multi-phased Wandoan South renewable energy project in Queensland. This expansion aims to enhance renewable energy generation capacity in the region, contributing to Queensland's energy landscape and supporting Australia's net zero goals by 2050. |
Original sector | Renewable Energy |
Location
Country | Australia |
State | Queensland |
City | Wandoan |
Source
Source | pv magazine Australia |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2025-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
