Wang Winery Site Developemnt
Bid results · California · Last reported Aug 2024
Source: Dodge USA
Scope of work: Erosion Control: best practices, stabilized entrance, and SWPPP BMP's as required to protect the Jurisdictional Habitat Area (Blue Line Creek). Demolition of chain link fencing along the creek and demolition of the well structure. Demolition and removal of all trees (approximately 514 palms/trees), with the exception of Cypress trees and trees adjacent to the residence. Cost to incl
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- Temecula, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wang Winery Site Developemnt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work: Erosion Control: best practices, stabilized entrance, and SWPPP BMP's as required to protect the Jurisdictional Habitat Area (Blue Line Creek). Demolition of chain link fencing along the creek and demolition of the well structure. Demolition and removal of all trees (approximately 514 palms/trees), with the exception of Cypress trees and trees adjacent to the residence. Cost to include stump removal and mulching as broken out on the bid form. Surveying Clear & Grub/Grading: pro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Temecula |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
