logo
ProjectPlanned

Wangchhu Hydroelectric Project

Planned · Bhutan · Last reported Sep 2025

Source: Indiablooms

A 570 MW hydroelectric project in Bhutan developed jointly by Adani Power and Druk Green Power Corporation (DGPC) on a BOOT basis. The project aims to meet Bhutan's peak winter demand and export power to India during summer months. Construction is planned to start in the first half of 2026 with completion targeted within five years.

Status
Prospective
Sector
Power Generation (CCGT), Hydro
Location
Bhutan
Updated
22 Jul 2026
Source
Indiablooms

ConstructChat

Ask ConstructChat about Wangchhu Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wangchhu Hydroelectric Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bhutan. Taiyo aggregates data on it from Indiablooms.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 570 MW hydroelectric project in Bhutan developed jointly by Adani Power and Druk Green Power Corporation (DGPC) on a BOOT basis. The project aims to meet Bhutan's peak winter demand and export power to India during summer months. Construction is planned to start in the first half of 2026 with completion targeted within five years.

Original sector

Energy

Budget

Location

Country

Bhutan

Source

Source

Indiablooms

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project