Wangchhu Hydropower Project
Sector: Hydro • Location: Bhutan
Source: Whalesbook
Consulting services contract for the 570MW Wangchhu Hydropower Project in Bhutan, involving design and engineering of the diversion tunnel and related components. The project duration is expected to be 8 months.
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Manufacturing (Industrial), Tunnel
- Location
- Bhutan
- Updated
- 22 Jul 2026
- Source
- Whalesbook
ConstructChat
Ask ConstructChat about Wangchhu Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consulting services contract for the 570MW Wangchhu Hydropower Project in Bhutan, involving design and engineering of the diversion tunnel and related components. The project duration is expected to be 8 months. |
Original sector | Energy |
Budget |
Location
Country | Bhutan |
Source
Source | Whalesbook |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Manufacturing (Industrial), Tunnel |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
