logo
ProjectClosed

WAPDA V (POWER TRANS

Sector: Water Supply and Storage • Location: Pakistan

Source: World Bank Group

The Fifth WAPDA Power Project will assist the Water and Power Development Authority (WAPDA) in the expansion of the extra high voltage power transmission network, thereby permitting the optimal operation of interconnected generation facilities and contributing to reduced transmission losses. The project consists of: (a) the installation of 1,100 km of 500-kV transmission line, (b) the installatio

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WAPDA V (POWER TRANS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WAPDA V (POWER TRANS” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Fifth WAPDA Power Project will assist the Water and Power Development Authority (WAPDA) in the expansion of the extra high voltage power transmission network, thereby permitting the optimal operation of interconnected generation facilities and contributing to reduced transmission losses. The project consists of: (a) the installation of 1,100 km of 500-kV transmission line, (b) the installation of two new 500-kV substations and the extension and reinforcement of four existing 500-kV substations, and (c) consulting services for (i) implementing a system for the collection, storage and retrieval of data on power, (ii) a load research and demand management study, and (iii) a feasibility study and detailed engineering for a power generation complex based on imported coal. The project consists of normal electric utility work entailing no unusual risks and no particular difficulty is foreseen in its execution.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project