WAPDA VI - KOT ADDU
One of 10,000+ projects Taiyo tracks in Pakistan.
Source: World Bank Group
The Kot Addu Combined Cycle Power Project involves the conversion of two 100 megawatt (MW) and two 125 MW combustion turbines under construction at Kot Addu into combined cycle units with the addition of four heat recovery boilers and two steam turbo-generators of about 100 MW each as well as the construction of about 104 km of 220 kv transmission lines from Kot Addu to Multan and the addition of
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Hydro, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WAPDA VI - KOT ADDU
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kot Addu Combined Cycle Power Project involves the conversion of two 100 megawatt (MW) and two 125 MW combustion turbines under construction at Kot Addu into combined cycle units with the addition of four heat recovery boilers and two steam turbo-generators of about 100 MW each as well as the construction of about 104 km of 220 kv transmission lines from Kot Addu to Multan and the addition of connecting bays at these grid substations. The station is expected to operate on high speed diesel oil; however, provision is being made for the use of alternate fuel (gas, furnace oil, crude oil) if and when this is available. The fuel will be supplied through an existing pipeline from Karachi to Gujrat, which will be extended to Kot Addu with a 30 km spur pipeline. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
