logo

WAPP - Electrification and grid reinforcement along 4-country transmission line CLSG in Monrovia

Sector: Commercial • Location: Liberia

Source: KFW Bank aus Verantwortung

Project
Active

The FC measure Electrification of Monrovia in the context of the WAPP Access to Energy along the Four-Country Transmission Line CLSG is considered the third essential building block for a sustainable and secure electricity supply in Liberia after the two projects Rehabilitation of the Mt. Coffee Hydroelectric Power Plant and Construction of the Four-Country Transmission Line CLSG. The measure incl

Project Information FAQ

Project Information

5 Q
The project “WAPP - Electrification and grid reinforcement along 4-country transmission line CLSG in Monrovia” is an infrastructure initiative in the Commercial sector, located in Liberia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC measure Electrification of Monrovia in the context of the WAPP Access to Energy along the Four-Country Transmission Line CLSG is considered the third essential building block for a sustainable and secure electricity supply in Liberia after the two projects Rehabilitation of the Mt. Coffee Hydroelectric Power Plant and Construction of the Four-Country Transmission Line CLSG. The measure includes the construction of the network infrastructure at distribution level, the grid connection of the project areas and the installation of prepayment meters. The aim of the FC measure is to provide up to 16,000 electricity consumers in Monrovia with reliable access to inexpensive and environmentally friendly electricity from the national grid. The measure will thus create a sustainable electricity supply for up to 80,000 people, a higher utilization of the Mt. Coffee Hydroelectric Power Plant and the CLSG line and a significant contribution to sustainable economic and social development in the capital of Liberia. The target group of the measure are households, companies (mainly MSMEs) and public institutions in the project areas and indirectly all residents of the greater Monrovia area, who benefit from improved economic competitiveness and the associated positive employment effect. The costs of the project are expected to amount to EUR 15-20 million. These are to be covered in part by an FC grant of EUR 15 million and a contribution from the Liberian partners.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data