WAPP - Ghana - Côte d'Ivoire transmission line, (Côte d'Ivoire section)
One of 427 projects Taiyo tracks in Cote d'Ivoire.
Source: KFW Bank aus Verantwortung
As a contribution to the integration of the national electricity markets in the region of the West African Community of States ECOWAS, KfW, on behalf of the German government, is supporting the first phase of the Ivorian section of the cross-border high-voltage transmission line between Ghana and Côte d'Ivoire with a loan of 30 million euros. The project is a priority project of the WAPP. The aim
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT), Power Transmission
- Location
- Cote d'Ivoire
- Updated
- 19 Nov 2026
- Source
- KFW Bank aus Verantwortung
ConstructChat
Ask ConstructChat about WAPP - Ghana - Côte d'Ivoire transmission line, (Côte d'Ivoire section)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | As a contribution to the integration of the national electricity markets in the region of the West African Community of States ECOWAS, KfW, on behalf of the German government, is supporting the first phase of the Ivorian section of the cross-border high-voltage transmission line between Ghana and Côte d'Ivoire with a loan of 30 million euros. The project is a priority project of the WAPP. The aim of the Financial Cooperation (FC) measure is to help improve the security of the electricity supply for the population and to promote economic development in Côte d'Ivoire, while also contributing to the integration of West Africa's electricity markets. At the same time, the project is helping to increase the efficiency and modernize the electricity transmission networks in Côte d'Ivoire. The first part of the FC measure essentially envisages the construction of a 50-kilometer-long section of the 400 kV high-voltage line between the Akoupé-Zeudji and Bingerville switching stations, as well as its integration into the switchgear. Bingerville is the end point of the existing 225 kV transmission line between Ghana and Côte d’Ivoire. |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | KFW Bank aus Verantwortung |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Power Transmission |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Cote d'Ivoire
- 225/150 kV Ferke (Côte d'ivoire) - Sikasso (Mali) - Ségou (Mali) Interconnection Project
- 225 kV Côte dIvoire - Liberia - S.Leone - Guinea Interconnection Project
- Cross Border Supply of Electricity to Rural Communities in Liberia from Côte d'Ivoire
- Biomass plant PPP project in Côte d'Ivoire
- Logistics center PPP project in Abidjan
- Lagune Aghien treatment plant PPP project
- Abobo Town Hall roundabout PPP Project in Abidjan
- Felix Houphouet Boigny Airport concession in Abidjan