WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
Closed · Western and Central Africa
Source: World Bank Group
The Coastal Transmission Backbone Project for Ghana will increase access of West Africa Power Pool (WAPP) Zone A coastal states to more stable and reliable electricity as a means to alleviate power supply deficits and/or to reduce their collective vulnerability to drought-induced power supply disruptions. Infrastructure Components: The project aims to complete and put into full operation the entir
- Status
- Closed
- Sector
- Power Transmission, Hydro, Power Generation (CCGT), Government, Automotive
- Location
- Central African Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Coastal Transmission Backbone Project for Ghana will increase access of West Africa Power Pool (WAPP) Zone A coastal states to more stable and reliable electricity as a means to alleviate power supply deficits and/or to reduce their collective vulnerability to drought-induced power supply disruptions. Infrastructure Components: The project aims to complete and put into full operation the entire 330kV Coastal Transmission Backbone by 2009, in two tranches. The first tranche (FYQ5) of the WAPP APL 1 project will provide Volta River Authority (VRA) with investment support to expand transmission capacity, extend the operational lifetime of key transmission facilities, and improve the quality and reliability of bulk power transfers along the Aboadze-Volta segment of the 330kV Coastal Transmission Backbone. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Central African Republic (CAR) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Hydro, Power Generation (CCGT), Government, Automotive |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Western and Central Africa
- West Africa Regional Energy Trade Development Policy Financing Program
- WAPP APL 1 (2nd Phase - COASTAL TRANSMISSION BACKBONE)
- WAPP-APL4 (Phase 1): Côte d'Ivoire Liberia Sierra Leone and Guinea Regional Interconnector- Additional Financing
- WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development
- Cameroon - Chad Power Interconnection Project
- OMVG Interconnection Project
- Central African Power Pool Regional Interconnection and Access (CAPP-RIA) - Phase 1
- North Core/Dorsale Nord Regional Power Interconnector Project
