logo
ProjectClosed

WAPP APL 2 - OMVS Felou Hydroelectric Project

Sector: Power Generation (CCGT) • Location: Western and Central Africa

Source: World Bank Group

The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b)

Status
Closed
Sector
Power Generation (CCGT), Commercial, Hydro, Government, Automotive
Location
Central African Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WAPP APL 2 - OMVS Felou Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WAPP APL 2 - OMVS Felou Hydroelectric Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Western and Central Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b) develop the power system of the Senegal River Basin Development Authority (OMVS) into a nucleus power pooling mechanism that can be replicated for other sub-regions of WAPP "Zone B". This developmental objective is to be achieved, inter alia, by: (a) implementing the proposed OMVS 2nd Generation Hydropower Projects at the Felou and Gouina sites using a Design-Build-Operate-Transfer (DBOT) approach that involves deployment of date-certain, fixed price, performance-based contracts for each plant (see Figure 2 below); and (b) providing institutional restructuring and capacity building support to improve the efficiency and performance of the public-private partnership involving an OMVS-sponsored power asset holding entity (currently the Societe de Gestion de l'Energie de Manantali - SOGEM) and a private operation and maintenance concessionaire (currently ESKOM Energie Mali (EEM). As part of the ongoing restructuring of OMVS institutions5, SOGEM is to be transformed into the proposed L'Agence de Gestion du Patrimoine de l'OMVS (AGP-OMVS).

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Central African Republic (CAR)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Hydro, Government, Automotive

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project