WAPP APL 2 - OMVS Felou Hydroelectric Project
Sector: Power Generation (CCGT) • Location: Western and Central Africa
Source: World Bank Group
The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b)
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Hydro, Government, Automotive
- Location
- Central African Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WAPP APL 2 - OMVS Felou Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b) develop the power system of the Senegal River Basin Development Authority (OMVS) into a nucleus power pooling mechanism that can be replicated for other sub-regions of WAPP "Zone B". This developmental objective is to be achieved, inter alia, by: (a) implementing the proposed OMVS 2nd Generation Hydropower Projects at the Felou and Gouina sites using a Design-Build-Operate-Transfer (DBOT) approach that involves deployment of date-certain, fixed price, performance-based contracts for each plant (see Figure 2 below); and (b) providing institutional restructuring and capacity building support to improve the efficiency and performance of the public-private partnership involving an OMVS-sponsored power asset holding entity (currently the Societe de Gestion de l'Energie de Manantali - SOGEM) and a private operation and maintenance concessionaire (currently ESKOM Energie Mali (EEM). As part of the ongoing restructuring of OMVS institutions5, SOGEM is to be transformed into the proposed L'Agence de Gestion du Patrimoine de l'OMVS (AGP-OMVS). |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Central African Republic (CAR) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Hydro, Government, Automotive |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Western and Central Africa
- Solar Development in Sub-Saharan Africa - Phase 1 (Sahel)
- WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
- Regional Emergency Solar Power Intervention Project
- Regional Off-Grid Electricity Access Project Additional Financing
- Kandadji Project
- WAPP: The First Phase of the Inter-Zonal Transmission Hub Project of the WAPP (APL3) Program
- Niger Basin Water Resources Development and Sustainable Ecosystems Management Project
- West Africa Regional Energy Trade Development Policy Financing Program
