logo

WAPP APL 2 - OMVS Felou Hydroelectric Project

Sector: Power Generation (CCGT) • Location: Western and Central Africa

Source: World Bank Group

Project
Closed

The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b)

Project Information FAQ

Project Information

5 Q
The project “WAPP APL 2 - OMVS Felou Hydroelectric Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Western and Central Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b) develop the power system of the Senegal River Basin Development Authority (OMVS) into a nucleus power pooling mechanism that can be replicated for other sub-regions of WAPP "Zone B". This developmental objective is to be achieved, inter alia, by: (a) implementing the proposed OMVS 2nd Generation Hydropower Projects at the Felou and Gouina sites using a Design-Build-Operate-Transfer (DBOT) approach that involves deployment of date-certain, fixed price, performance-based contracts for each plant (see Figure 2 below); and (b) providing institutional restructuring and capacity building support to improve the efficiency and performance of the public-private partnership involving an OMVS-sponsored power asset holding entity (currently the Societe de Gestion de l'Energie de Manantali - SOGEM) and a private operation and maintenance concessionaire (currently ESKOM Energie Mali (EEM). As part of the ongoing restructuring of OMVS institutions5, SOGEM is to be transformed into the proposed L'Agence de Gestion du Patrimoine de l'OMVS (AGP-OMVS).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data