logo

WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development

Sector: Power Transmission • Location: Western and Central Africa

Source: World Bank

Project
Closed

The overall developmental objective of the West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project is to increase access to electricity supply to Liberia and Guinea through power provided in the medium to long term from the exploitation of viable indigenous generation resources in a

Project Information FAQ

Project Information

5 Q
The project “WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development” is an infrastructure initiative in the Power Transmission sector, located in Western and Central Africa. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The overall developmental objective of the West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project is to increase access to electricity supply to Liberia and Guinea through power provided in the medium to long term from the exploitation of viable indigenous generation resources in accordance with a least-cost plan, but obtained in the near-term from Cote d'Ivoire and commercial mining operations in the area. There are two components to the project. The first component of the project is the West Africa Power Pool (WAPP) Cote d'Ivoire, Sierra Leone, Liberia, and Guinea (CLSG) power interconnection project. The second component of the project is the WAPP integration and technical assistance project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data