WAPP Coastal Backbone

Sector: Power Generation (CCGT) • Location: Cote d'Ivoire

Source: European Union Africa Infrastructure Trust Fund

Project
Under Disbursement

The objective of the Project is to reinforce the 330 kV Abobo (Cote d’Ivoire) – Prestea (Ghana) power exchange on the West African Power Pool (WAPP) Coastal Backbone, and enable increased power exchanges between the two countries. The Project will form part of a larger 330 kV transmission link, which will connect Ivory Coast to Ikeja West in Nigeria. The Project will enhance regional integration b

Project Information FAQ

Project Information

4 Q
The project “WAPP Coastal Backbone” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Cote d'Ivoire. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under disbursement

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Project is to reinforce the 330 kV Abobo (Cote d’Ivoire) – Prestea (Ghana) power exchange on the West African Power Pool (WAPP) Coastal Backbone, and enable increased power exchanges between the two countries. The Project will form part of a larger 330 kV transmission link, which will connect Ivory Coast to Ikeja West in Nigeria. The Project will enhance regional integration by supporting the interconnection of Ivory Coast and Ghana and more broadly strengthen the Coastal Backbone, which will also connect Benin, Togo and Nigeria, as well as supporting the WAPP more generally. The TA grant was made available to the WAPP which contracted two international consultants to conduct (i) a technical, economic & financial Feasibility Study, and subsequently prepare tender documentation for the project and (ii) the line route study and the ESIA. The line route study and ESIA were launched in April 2011 and have advanced to the point of final draft reports being submitted. The Feasibility Study was launched only in January 2012 due to delays caused by the instability in Ivory Coast, which prevented transit in the country (around 60% of the line route is in Ivory Coast).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data