Waratah Super Battery
Under construction · New South Wales · Last reported Jun 2025
Source: RenewEconomy
The Waratah Super Battery is the most powerful big battery to be built in Australia, sized at 850 MW and 1680 MWh. It is being built at the site of the decommissioned Munmorah coal generator and is designed to act as a giant "shock absorber" to the grid, allowing extra capacity on the main transmission lines feeding Sydney, Newcastle, and Wollongong. It was contracted to help fill the gap created
- Status
- Under Construction
- Sector
- Energy Storage
- Location
- New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Waratah Super Battery
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Waratah Super Battery is the most powerful big battery to be built in Australia, sized at 850 MW and 1680 MWh. It is being built at the site of the decommissioned Munmorah coal generator and is designed to act as a giant "shock absorber" to the grid, allowing extra capacity on the main transmission lines feeding Sydney, Newcastle, and Wollongong. It was contracted to help fill the gap created by the anticipated closure of the Eraring coal plant. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
