Ward WTP Chemical Feed Line Replacement
Sector: Commercial • Location: High Point, North Carolina, United States of America
Source: Dodge USA
The work includes the demolition and replacement of the 13 CPVC lines that run along the chemical containment wall and the side of the building at the Ward Water Treatment Plan (see drawing). The new lines will be connected by a CPVC true union ball valve at each location where the existing pipe protrudes through the wall. The new lines will be hung on new uni-strut with pipe clamps. The pipe, uni
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- High Point, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ward WTP Chemical Feed Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the demolition and replacement of the 13 CPVC lines that run along the chemical containment wall and the side of the building at the Ward Water Treatment Plan (see drawing). The new lines will be connected by a CPVC true union ball valve at each location where the existing pipe protrudes through the wall. The new lines will be hung on new uni-strut with pipe clamps. The pipe, uni-strut, pipe clamps, and pipe insulation will be installed per the specifications. In order to li... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | High Point |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
