Warehouse
Sector: Cement • Location: Gardena, California, United States of America
Source: Dodge USA
Demolish an existing 58,965 square-foot vacant warehouse and construct a new 60,558-squarefoot tilt-up warehouse building with 4,000 square feet of ground floor office space, an additional 4,000 square feet of mezzanine office space, 7 truck loading docks and surface parking.
- Status
- Closed
- Sector
- Cement, Commercial, Car parking, Manufacturing (Industrial), Residential, Warehouse, Automotive
- Location
- Gardena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Warehouse
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolish an existing 58,965 square-foot vacant warehouse and construct a new 60,558-squarefoot tilt-up warehouse building with 4,000 square feet of ground floor office space, an additional 4,000 square feet of mezzanine office space, 7 truck loading docks and surface parking. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Gardena |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Car parking, Manufacturing (Industrial), Residential, Warehouse, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
