Warren 2025 Administration Building Remodeling
Closed · Ohio · Last reported Sep 2025
Source: Dodge
Area 1 of remodeling is a build-out of 3rd floor vacant space into 3 offices, large open cubicle area, storage room, and corridor as outlined below: a. Demo door and frame from the hallway and create a new cased opening. b. Demo walls as needed to create the new layout shown on owner-provided drawing. c. Patch all walls impacted by the demolition. d. Metal stud framing to be 6 above the new ceilin
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Metal, Government, Commercial
- Location
- Lebanon, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Warren 2025 Administration Building Remodeling
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Area 1 of remodeling is a build-out of 3rd floor vacant space into 3 offices, large open cubicle area, storage room, and corridor as outlined below: a. Demo door and frame from the hallway and create a new cased opening. b. Demo walls as needed to create the new layout shown on owner-provided drawing. c. Patch all walls impacted by the demolition. d. Metal stud framing to be 6 above the new ceiling grid system. Warren County Department of Facilities Management Page 2 of 7 e. Furnish and insta... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Lebanon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Metal, Government, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
