Warrenton Marina E Dock Pile Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The intent of this contract is to replace 10 steel pilings along the Warrenton Marinas Commercial E Dock by the vibration method. The following is a brief summary of the major elements of work that are to be provided by the contractor 1. Replace 10 steel pilings that are 12 inches in diameter. 2. Follow current DSL permit requirements during replacement Any bids received after the above specified
- Status
- Closed
- Sector
- Steel, Commercial, Seaport, Manufacturing (Industrial), Government, Metal
- Location
- Warrenton, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Warrenton Marina E Dock Pile Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this contract is to replace 10 steel pilings along the Warrenton Marinas Commercial E Dock by the vibration method. The following is a brief summary of the major elements of work that are to be provided by the contractor 1. Replace 10 steel pilings that are 12 inches in diameter. 2. Follow current DSL permit requirements during replacement Any bids received after the above specified time will not be considered. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Warrenton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Seaport, Manufacturing (Industrial), Government, Metal |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
